Total floor area about 100,000 m². We were awarded the air conditioning and fire safety (smoke control) work as one package in May 2014.

Air conditioning ducts and piping installed in the ceiling

Outline

Project overview

工事概要

Category
Commercial
Location
Shiga Prefecture
Use
Large Shopping Center
Scale
Total floor area about 100,000 m²
Types of work
Renovation (common areas and about 66 tenant stores)
Our scope
Air conditioning, ventilation and fire safety (smoke control) work awarded as one package
Related services
Mechanical work
Scope of work
Air conditioning, fire safety (smoke control)
Period
2014 (awarded May 2014)

Scale

An area of about 100,000 m²

約10万㎡の広さ

A total floor area of about 100,000 m² is about the size of two Tokyo Domes. We installed the air conditioning and smoke control systems in sales and common areas of this size.

100,000 m²Total floor area (approx.)

In Tokyo Domes

2 Tokyo DomesApprox., based on the Tokyo Dome building area of 46,755 m²

About 100,000 m² ÷ 46,755 m² ≈ 2.1. Total floor area is the sum of the floor area of every floor.

Story

Challenge and response

課題と対応

The larger the building, the more the building systems overlap in space and in schedule.

Issue

Air conditioning and smoke control systems had to be installed in the sales areas and common areas, with a total floor area of about 100,000 m². Both use ducts in the ceiling space, so their routes and schedules easily clash.

Action

We were awarded the air conditioning, ventilation and smoke control ductwork as one package, and prepared the drawings and carried out the installation in parallel.

Result

We carried out all of the air conditioning, ventilation and smoke control work without cutting corners. The trust and track record we gained on this project led to a wider range of work afterwards.

Approach

How we work

当社の進め方

Looking back on this project, Takashi Wago, our President and Representative Director, says, “The hardest part was that we could not cut any corners.” It meant renovating the smoke control system of an existing building, work in which SOWA SERVICE had little experience at the time. The schedule was tight, with drawings and installation running in parallel, and the job site was far away.

At SOWA SERVICE, we check each part, one by one, and ask “Is this the best way?” This includes the ceiling spaces that are hidden once the building is finished, the drawings and the test runs. We share what we notice openly and redo work when needed. Meeting expectations on schedule and budget matters to us just as much. Completing this project was a turning point for our company.