Issue
Air conditioning and smoke control systems had to be installed in the sales areas and common areas, with a total floor area of about 100,000 m². Both use ducts in the ceiling space, so their routes and schedules easily clash.
Action
We were awarded the air conditioning, ventilation and smoke control ductwork as one package, and prepared the drawings and carried out the installation in parallel.
Result
We carried out all of the air conditioning, ventilation and smoke control work without cutting corners. The trust and track record we gained on this project led to a wider range of work afterwards.
